Electro mechanical and C&I consultancy for Kaleshwaram Extension Link IV Reach 2 (PS2) MID MANER (AT REACH-2)    Electro mechanical and C&I consultancy for PRRLIS Stage I    Electro mechanical and C&I consultancy for Kaleshwaram Extension Link II Reach 2 (PS2) - Yellampally reservoir to MID Maneru Reservoir   Electro mechanical and C&I consultancy for Kaleshwaram Extension Link II Reach 1 (PS1) - Yellampally reservoir to MID Maneru Reservoir    Electro mechanical and C&I consultancy for PRRLIS Stage IV    JWIL given Electrical work and Fire system work for Tanzania Pkg-1

International

Project of Rehabilitation and improvement of Water supply system in Zanzibar.

Title: Zanzibar: A water scheme in the spice islands
Description: We have crossed the Indian Ocean and landed in Zanzibar. The spice island famous for—cloves, nutmeg, cinnamon, and black pepper. But did you know that this tiny group of islands is also renowned in the history books for the shortest war -38 minutes that took place when slavery was abolished.

Zanzibar, a part of Africa, does not have lions, elephants and other wild animals. Here, safaris happen underwater in the Indian Ocean. MEIL team executing the rehabilitation and improvement of the water supply scheme in two towns, Dole and Mfenesini, on this beautiful island off the coast of East-Central africa. With no fresh water rivers running, water is drawn from the ground through borewells.

Project Details

ContractorMegha Engineering & Infrastructures Limited, Hyderabad
End ClientZANZIBAR WATER AUTHORITY (ZAWA),
MALAWI ROAD MSIKITI MABUULU, ZANZIBAR, TANZANIA, AFRICA
LocationUngujaisland,
Zone- Mfenesini Zone, Mfenesini Scheme
Zone- Kizimbani Zone, Dole scheme
ConsultantCRUSX Consultants Pvt. Ltd. Delhi
Technical DetailsMfenesin scheme has 10no. borewells at various locations. Flow of borewells in- range of 70 m3/hr to 140m3/hr. The rising main from each borewell location will fill up raw water storage reservoir, the pumping machinery installed at storage reservoir will pump the water to the overhead distribution tank.
Dole scheme has 10no. borewells at various locations. Flow of borewells in- range of 70 m3/hr to 140m3/hr. The rising main from each borewell location will fill up raw water storage reservoir, the pumping machinery installed at storage reservoir will pump the water to the overhead distribution tank.
Scope of WorkEngineering services for Electrical, mechanical, C&I SCADA, Fibre optic communication for all borewell, data can monitor at main pumping station. User can control and monitor all borewell from main pumping station. Mechanical interconnection piping, Mechanical equipment scrutiny etc. done.