Contractor: KBL
End Client: Ministry of Public Works, Republic of Suriname
Project: 9 New pumping Station- Flood water Scheme
| Technical Details | Discharge | Total Head | Qty | Type of Motor | Type of pump |
| m3/s | m | no. | |||
| Clevia (PS-A) | 0.5 | 4.79 | 2 | Induction | Vertical Turbine |
| Geyersvlijit (PS-B) | 0.75 | 4.79 | 2 | Induction | Vertical Turbine |
| Saramcca Doorsteek (PS-C) | 7 | 5.47 | 3 | Induction | Vertical Turbine |
| Tout Lui Faut (PS-D) | 4 | 5.54 | 3 | Induction | Vertical Turbine |
| Houtlrlin (PS-E) | 0.5 | 4.14 | 2 | Induction | Vertical Turbine |
| Vredenburg (PS-F) | 0.5 | 4.14 | 2 | Induction | Vertical Turbine |
| Meerzorg (PS-G) | 2 | 4.86 | 2 | Induction | Vertical Turbine |
| Creola (PS-H) | 0.75 | 3.96 | 2 | Induction | Vertical Turbine |
| Breekhizen (PS-I) | 0.75 | 4.01 | 2 | Induction | Vertical Turbine |
| Mechanical GA drawings | |||||
| Electrical Scope : | |||||
| 1. Single Line Diagram | |||||
| 2. Earthing, Lighting, Lightning Drawings | |||||
| 3. Cable Routing Drawings | |||||
| 4. Earthing, Lighting, Lightning Bill of Quantities (BOQ) | |||||
| Control & Instrumentation Scope : | |||||
| 1. Process & Instrumentaion Diagram | |||||
| 2. Instruments List | |||||
| 3. Input-Output List | |||||
| 4. Operation Philosophy | |||||